This is part of the area that we will be working on including the rock ditch, and the pvc pipe by the sidewalk.
This is how the water currently drains and we don't want this!
So...
This is how we want the water drain after we are done with our work.
Here is where us students will need to install a PVC pipe underneath this sidewalk.
This is Mrs. Sharon A. (president of the Friends of Bledsoe) on the left, and Mr. Bill (a park ranger) on the right.
Thursday, October 16, 2008
Posted by Unknown at 11:12 AM
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment